2022-09-15 09:50:27
We have explained a lot about the jaw crusher before. I don’t know if we all understand it. Today we want to explain to you a very important and simple question, which is about the operation of the jaw crusher equipment. If the jaw crusher equipment has just been made and our users need to use it, then we have to do a test run, so as to ensure our stability during use. We have and requirements for the jaw crusher test run, Let's look at it in detail: Requirements for the test run of jaw crusher equipment:
1. For no-load operation, it needs more than 2 hours so that it can be sped.
2. During our no-load operation, we need to observe the swing of the crusher to see if it is stable and if not, we need to transform it.
3. We need to pay more attention to lubrication. During our use, we must have a control over the temperature of the lubricated bearing. Under normal circumstances, the temperature should be less than 70 degrees.
4. When we test drive, we need to check all aspects of the equipment, including listening and smelling that we can use, to judge whether our equipment is faulty.