2. The equipment damage caused by the stagnation of the cone crusher caused by the motor failure will cause the materials in operation to be blocked in the equipment. It is necessary to s the machine in time to discharge the materials, and then repair the equipment.
3. Due to the serious wear or damage of the moving and fixed cones of the cone crusher during work, some oversized materials will be blocked at the discharge port, resulting in equipment blockage. Therefore, the movement of the cone crusher should be checked regularly. Cones and fixed cones, and problems should be dealt with in time.
4. If the crusher is blocked due to improper feeding, it should be noted that the feeding must be kept uniform, neither too much nor too little. Iron blocks or other large pieces of non-crushed objects entering the crushing cavity cannot be discharged, causing the cone crusher to block material, or the feeding properties are not suitable for the cone crusher.