Global site: Chinese | Russian | English

Zhongxin machine, let the machine change the future!

Whatsapp:+8613676922906

E-mail:sales@zxcrusher.com

  • whatsappWhatsApp
  • WechatWechat
News

Home > News

Precautions for starting the cone crusher

2021-05-31 14:37:20
The cone crusher can only start feeding after 1-2 minutes of running at no load. Cone crusher is a relatively widely used stone crushing equipment. In the crushing production, we often find that the crushing effect is not * due to improper operation. In order to ensure the normal operation of the machine, here are some precautions for the cone crusher:   

1, After starting the oil pump motor for 5-10 minutes, check the working condition of the lubrication system. The main motor can only be started after the main motor is working normally.

2, Before starting, please check the lubrication system, taper, correct the belt tension, and tighten all screws.  
 

3, When sping normally, the ore supply should be sped *, and only in all cases, the main motor can s removing the ore in the crusher. Then s the oil pump motor.  
 
After sping, check all parts completely and deal with all problems in time.   

4, the cone crusher can only start feeding after 1 to 2 minutes of no-load operation.  
 
Because the cone crusher is full of ore, it is necessary to pay attention to whether the ore is normal, especially the ore with a lot of mud and high moisture, to prevent the ore from blocking the feed inlet.  
 
Also pay attention to check the discharge situation during the operation, and it is not allowed to accumulate ore in the space below the sealing device.  
 
Copyright 2015-2023 © Jiaozuo Zhongxin Heavy Industrial Machinery Co.,Ltd All Right Reserved