2021-05-27 14:51:50
1,After each production operation of the cone crusher, there will be some material residues inside. If these material residues are not cleaned for a long time, it may cause blockage. Especially the holes of the screen, because the screen often has friction with the material, and sometimes the holes will leave some material residue. If it is not cleaned for a long time, the screen will be blocked. When the humidity of the crushed raw material is too high at the discharge port, the viscosity of the crushed material will be *er. It may stick to the discharge pipe, and if this is done for a long time, it will cause the discharge port to be blocked. Therefore, the internal cleaning of the cone crusher must be done well.
2, Generally, the internal cleaning of the cone crusher is carried out by the fan, so we can use the fan to discharge the material residues that can be discharged from the equipment after the daily production operation, and then turn off the cone crusher. After that, we can open the fuselage and take out the screen inside the machine to carefully clean up the material residue attached to it, and then install it after the cleaning is completed. In this way, clogging can be effectively avoided and there is no need to worry about discoloration of the material after crushing.
If it is not cleaned, it will lead to a decrease in work efficiency, but now many users often do not meet the standards, so they will not clean up, resulting in problems when using the cone crusher later, so we must follow the relevant instructions to operate.