2020-06-12 16:27:16
1. Only when the cone crusher starts working normally, can the materials be put into production. 2. The crushed material must be put into the crushing chamber evenly. Never add the material from the side or pile it up, so as not to cause one-sided overload of the equipment or the pressure of overload.
3. When the cone crusher equipment is working normally, the temperature of the bearing must not exceed 30 degrees, and the highest temperature must not exceed 70 degrees. If the temperature of the cone crusher exceeds the above temperature during the work, you need to s working immediately checking. After identifying the cause, take immediate measures to resolve it.
4. Before the cone crusher equipment ss working, it must s feeding and wait for all the materials in the crushing chamber to be removed before turning off the power. This is not easy to cause clogging in the crushing chamber.
5. When the cone crusher is working, if it is sped due to too much material in the crushing chamber, the power should be turned off immediately to s the crusher's work, the materials should be cleaned up, and then the work can be run again.
6. After using the cone crusher equipment for a period of time, it must be maintained and inspected to check the stability of each component.