1. Start without load
The hydraulic cone crusher must be started under no-load state, and the mine can only be started after the crusher is running normally, so as not to increase the load of the motor, resulting in excessive starting current and even burning the motor. 2. Feeding amount should be uniform
Adjust the amount of ore feed in a timely manner to ensure that the ore feed is added evenly and in an appropriate amount, so as not to increase the local friction of the machine and make it "stuck".
3. Pay attention to check the running part
After the installation of the hydraulic cone crusher in the * trial operation stage, you should * check whether the running part is stuck or collided, and then start the operation after checking the normal. During operation, * run for 4 hours at no load, check the flexibility of the pulley, whether the machine is firmly installed, and whether there are other noises.
4. Pay attention to the temperature rise of the rotor main bearing
When the machine is running, pay attention to the temperature rise of the main bearing of the rotor. If the temperature rises above the specified value, s and check quickly. During operation, if the machine vibrates excessively or there is abnormal noise, it should be sped quickly to check the cause.
5. Repair and replace worn parts in time
The worn parts of the hydraulic cone, especially the main wear parts such as the main shaft and gears, which directly contact the material, should be regularly checked. If problems are found, they should be repaired and replaced in time to avoid failures in the later stage and affecting work efficiency.