2020-04-15 14:27:46
2. The equipment damage caused by the stagnation of the cone crusher due to the failure of the motor will cause the materials in operation to be blocked in the equipment. The equipment should be sped in time to discharge the materials and then the equipment should be repaired.
3. Due to the serious wear or damage of the cone crusher's dynamic and fixed cones during work, some oversized materials will be blocked at the discharge port, which will cause equipment clogging. Cone and fixed cone, deal with problems in a timely manner.
4. Crusher blocking due to improper feeding should pay attention to keep the feeding uniform, not too much or too little. Iron or other large pieces of non-crushed material that enter the crushing chamber cannot be discharged and cause the cone crusher to block the material, or the feeding properties are not suitable. The cone crusher is not acceptable.