2. When starting the main motor, turn off the disconnect switch and oil switch in order. When sping, the oil switch and isolation switch should be closed in sequence. When the host is still running, it is strictly forbidden to cut off the working power.
3. The lubrication station should be started before starting the host. The lubrication station can only be sped after the main engine has sped running. The host can feed only after it is normally started and running. It can only be sped after the feed is sped and completely emptied.
4. When the cone crusher is running, the temperature of the hydraulic oil should meet the requirements of the equipment.
5. The particle size of the broken material should meet the requirements of product specifications. The feed should pass through the distribution board, and the feed speed should not be higher than the horizontal level of the mortar wall.
6. The working current and power must not exceed 85% of the rated current and power.
7. Equipment should be regularly checked, maintained and repaired.
8. When the crusher is running, check the pressure of the locking system and the working condition of the hydraulic station. When oil leakage and insufficient locking force are found, s the machine for inspection and repair.